OD_Library/Checklists and Seed Docs/Checklist - New Prospective Job.md
2023-05-04 16:22:58 -05:00

3.1 KiB

  • Use of New? of existing?

    • what was the previous use
  • Site

    • easements?
  • Landlord?

    Title search

    • any encumbrances on the title?
  • SF over overall building

    • SF of scope
  • Neighboring tenants

  • Sprinklers

  • Adequate Exiting

  • ADA compliance

    • An accessible entrance
    • An accessible route to the primary function area
    • At least one accessible restroom for each gender
    • Accessible Drinking Fountains
    • Parking
    • Storage and Alarms
  • Salvage

    • Acoustical ceilings
    • Doors
    • Lighting
    • Finishes
  • Structure

    • Change of occupancy? Change of loads? Existing structure to accommodate?
    • Determine structure to determine construction type
    • structural composition of walls/floor/ceilings
      • thickness
  • Fire separation

    • Check doors
    • Stairs
  • HVAC

    • locations of main trunks and equipment
    • suggested locations of proposed equipment
  • Electrical

    • Lighting
  • Plumbing

    • existing restrooms enough for new use?
    • sewer stub location
    • water stub location
    • location of hot water heater
    • existing drinking fountain
  • Sprinklers

  • Sitting

    • Parking
    • Signage
      • zoning implications
  • Finishes - general strategy

  • Allocated budget

  • Schedule

  • Drawings

    • Permit set
    • Reflected ceiling
    • Finish plan
    • MEP?
  • Existing CAD files

  • What are the neighboring tenants

    • possibility measure or do reconnaissance on their suite to find any conflicts with what's planned

Restaurants

  • Main spaces

    • Entry

    • Kitchen

      • Prep
        • dedicated food prep sink
        • handsink
      • Cooking
        • Cooking: Grease
          • fryers
          • griddle
          • Type I hoods
          • Grease traps
        • Cooking: nonGrease
          • ovens
          • toaster
          • Type II hood
        • handsink
        • hoods
    • Dishwashing

      • Dish washing
        • dishwasher or 3 compartment sink
      • Type II Hood if heating
        • no hood, for smaller chemical DW
      • hand sink
    • storage

      • dry
      • refrigeration/freezer
      • mop sink, required
      • garbage strategy
    • Seating

      • seating types
    • Register

      • check out
      • displays
      • sneeze guards
      • refrigerated displays
      • Signage
      • Condiment area
    • Bathrooms

      • dishwasher or 3 compartment sink
      • taps
        • refrigeration lines
    • Restrooms

      • finishes
      • baby changing
      • Employee use
        • If public, faucet non-hand operated
    • offices

    • Equipment specs

  • What's the function?

    • space and function types?
    • one floor?
    • MEP requirements?
      • HVAC
        • heating/cooling approach
        • ventilation?
    • Help with finishes?
  • Site Layout

    • Zoning
      • entitlements?
    • Parking
    • Zoning
    • Landscaping
  • Phases

  • Schedule

  • Equipment layout?