* It's easy to understand that front loading all the disciplines early in the project would create a better project.
|
|
|
|
|
|
* Owner
|
|
* Reasons from owner
|
|
* generally take less time, of better quality, and less cost
|
|
* Single point of contact
|
|
* Construction costs or projections are typically more accurate
|
|
* no confrontation btwn architect and contractor
|
|
* minimize claims and damages
|
|
* eliminates finger pointing
|
|
* minimizes change orders
|
|
* Concerns
|
|
* How does an architect protect their interests? who's their advocate?
|
|
* Protect our representation, just like a sole architect would have to do.
|
|
* Have contractor's early input on the design and constructability actually improves quality
|
|
* Open book
|
|
* Share numbers publicly
|
|
* All communication with contractors/subs is transparent
|
|
|
|
|
|
* From Architect's perspective
|
|
* better control over the quality of design
|
|
* quicker
|
|
* Connections construction knowledge to design
|
|
* I can lean on the subs to help with improving the design from a cost/time/quality perspective
|
|
* Just in time detailing
|
|
* I don't have to design and detail out everything in the beginning
|
|
* Can improve just in-time detailing, informed by immediate research and sub input
|
|
* More profitable
|
|
|
|
- Reasons to Contractor
|
|
- Sharing risks and rewards
|
|
- Architect is on your team... no more finger pointing
|
|
- It's not a design problem, or construction problem, it's OUR problem
|
|
- Project specific
|
|
- Have a log of lessons learned can impart to subs
|
|
- estimates/cost from previous project
|
|
- Their head is in the project, being there from the beginning
|
|
|
|
|
|
* GMP
|
|
* if get under that, share profit
|
|
*
|
|
|
|
* Types of contracts
|
|
* Joint venture: Create separate design-build entity
|
|
*
|
|
* Costs
|
|
* first cost vs. life-cycle cost
|
|
*
|
|
|
|
* Insurance
|
|
* General liability insurance?
|
|
* Builder's Risk
|
|
* Worker's compensation
|
|
* Bonding?
|
|
* contractor's realm
|
|
|
|
* All subs in
|
|
* open to the public
|
|
*
|
|
|
|
* Why this project.
|
|
* We can reuse a lot of the drawings, if the design stays somewhat the same
|
|
* well the architectural and structural
|
|
* Applying lessons learned from previous project
|
|
|
|
<!--stackedit_data:
|
|
eyJoaXN0b3J5IjpbLTQ1NjU1NzAzNywyMDU1OTk5NTIyLC00Mz
|
|
U0MjI4MzAsMTQ4NTE2MDUyNCw3NDI0OTkyNjIsMTQ2ODU4MzQx
|
|
MCwxODU0NTg1OTMyLC0yMzg2MzU1NTksLTk0MjY0NTUwMSwyMD
|
|
M1MTYxNjI1LDE1MTczMTMzMTMsMTIwNDk1MzE0MSwxMDU2NTEy
|
|
NDA4LC0zNzY0Njg0OTMsMTM4MDAxMzUzOSw0NzkzMzkyMDEsMj
|
|
A0ODkxMjk3NiwtNDA4NzE0MzU2LC0xNDExMTQxODk5XX0=
|
|
--> |