6 lines
No EOL
263 B
Markdown
6 lines
No EOL
263 B
Markdown
- Phase 1: Programming (100%)
|
|
- Phase 2: Schematic Design (100%)
|
|
- Phase 3: Design Development (100%)
|
|
- Phase 4: Construction Documentation (100%)
|
|
- Phase 5 - Bidding and Construction Contract Negotiation (100%)
|
|
- Phase 6 - Construction Administration (100%) |