1ST FLOOR RCP-annotation.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
1ST FLOOR RCP-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
ADA - LAVATORY - FRONT-annotation.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - LAVATORY - FRONT-linework.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - LAVATORY - PLAN-annotation.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - LAVATORY - PLAN-linework.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - LAVATORY - SIDE-annotation.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - LAVATORY - SIDE-linework.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - WATER CLOSET - FLOOR PLAN-annotation.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - WATER CLOSET - FLOOR PLAN-linework.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - WATER CLOSET - FRONT-annotation.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - WATER CLOSET - FRONT-linework.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - WATER CLOSET - SIDE-annotation.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ADA - WATER CLOSET - SIDE-linework.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
ELEVATION - EAST - AT CENTER AVE-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - EAST - AT CENTER AVE-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - EAST - AT CENTER AVE-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - EAST - AT CENTER AVE-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - EAST - AT CENTER AVE.-annotation.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
ELEVATION - EAST - AT CENTER AVE.-linework.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
ELEVATION - EAST - AT CENTER AVE.-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
ELEVATION - EAST - AT CENTER AVE.-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
ELEVATION - NORTH - AT JOLIET ST-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - NORTH - AT JOLIET ST-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - NORTH - AT JOLIET ST-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - NORTH - AT JOLIET ST-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - SOUTH-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - SOUTH-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - SOUTH-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - SOUTH-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - WEST-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - WEST-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - WEST-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
ELEVATION - WEST-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
EXISTING FLOOR PLAN-annotation.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
EXISTING FLOOR PLAN-linework.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
EXISTING FLOOR PLAN-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
EXISTING FLOOR PLAN-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
FOUNDATION - 3D - 1-annotation.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
FOUNDATION - 3D - 1-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
FOUNDATION - 3D - 1-underlay.png
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
FOUNDATION - 3D - 1-underlay.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
FOUNDATION - 3D - 2-annotation.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
FOUNDATION - 3D - 2-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
FOUNDATION - 3D - 2-underlay.png
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
FOUNDATION - 3D - 2-underlay.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
FOUNDATION - 3D-annotation.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
FOUNDATION - 3D-linework.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
FOUNDATION - 3D-linework0001.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
FOUNDATION - 3D-underlay.png
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
FOUNDATION - 3D-underlay.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
FOUNDATION PLAN-annotation.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
FOUNDATION PLAN-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
FOUNDATION PLAN-underlay.png
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
FOUNDATION PLAN-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
LIFE SAFETY PLAN - 1ST FLOOR-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
LIFE SAFETY PLAN - 1ST FLOOR-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
LIFE SAFETY PLAN - 1ST FLOOR-underlay.png
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
LIFE SAFETY PLAN - 1ST FLOOR-underlay.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
LIFE SAFETY PLAN - MEZZANINE-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
LIFE SAFETY PLAN - MEZZANINE-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
LIFE SAFETY PLAN - MEZZANINE-underlay.png
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
LIFE SAFETY PLAN - MEZZANINE-underlay.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
LIFE SAFETY PLAN-annotation.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
LIFE SAFETY PLAN-linework.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
LIFE SAFETY PLAN-underlay.png
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
LIFE SAFETY PLAN-underlay.svg
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
M F - FULL HEIGHT PARTITION NOT RATED - HEAD-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
M F - FULL HEIGHT PARTITION NOT RATED - HEAD-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
NORTH SECTION-annotation.svg
|
snapshot
|
2025-10-15 21:27:36 -05:00 |
|
NORTH SECTION-linework.svg
|
snapshot
|
2025-10-15 21:27:36 -05:00 |
|
PERSPECTIVE - CENTER AVE. - NORTH-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE - CENTER AVE. - NORTH-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE - CENTER AVE.-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PERSPECTIVE - CENTER AVE.-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PERSPECTIVE- CENTER AVE. - SOUTH-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- CENTER AVE. - SOUTH-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- ENTRANCE-underlay.png
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
PERSPECTIVE- ENTRANCE-underlay.svg
|
20250617 - to owner and gc - Schematic Design - for pricing
|
2025-06-17 14:48:46 -05:00 |
|
PERSPECTIVE- JOLIET ST.-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- JOLIET ST.-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- LOBBY - LOOKING NORTH FROM MEZZ. STAIR-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- LOBBY - LOOKING NORTH FROM MEZZ. STAIR-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- LOBBY - LOOKING NORTH-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- LOBBY - LOOKING NORTH-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- LOBBY - LOOKING SOUTH-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- LOBBY - LOOKING SOUTH-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PERSPECTIVE- LOBBY LOOKING NORTH FROM MEZZ. STAIR-underlay.png
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
PERSPECTIVE- LOBBY LOOKING NORTH FROM MEZZ. STAIR-underlay.svg
|
troubleshoot: When I Cntl+Shift + create drawing, to bulk run the drawings, I get misalignments with the underlays.
|
2025-09-17 11:18:03 -05:00 |
|
PERSPECTIVE- LOBBY LOOKING NORTH-underlay.png
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
PERSPECTIVE- LOBBY LOOKING NORTH-underlay.svg
|
20250617 - to owner and gc - Schematic Design - for pricing
|
2025-06-17 14:48:46 -05:00 |
|
PERSPECTIVE- LOBBY LOOKING south2-underlay.png
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
PERSPECTIVE- LOBBY LOOKING south2-underlay.svg
|
troubleshoot: When I Cntl+Shift + create drawing, to bulk run the drawings, I get misalignments with the underlays.
|
2025-09-17 11:18:03 -05:00 |
|
PHASE - DEMOLITION PLAN-annotation.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE - DEMOLITION PLAN-linework.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE - DEMOLITION PLAN-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE - DEMOLITION PLAN-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE 1 - 1ST FLOOR-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 1 - 1ST FLOOR-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 1 - 1ST FLOOR-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 1 - 1ST FLOOR-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 1 - DEMO PLAN-annotation.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE 1 - DEMO PLAN-linework.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE 1 - DEMO PLAN-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE 1 - DEMO PLAN-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE 1 - DEMOLITION PLAN-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 1 - DEMOLITION PLAN-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 1 - DEMOLITION PLAN-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE 1 - DEMOLITION PLAN-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE 2 - 1ST FLOOR-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - 1ST FLOOR-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - 1ST FLOOR-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - 1ST FLOOR-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - DEMOLITION PLAN-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - DEMOLITION PLAN-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - DEMOLITION PLAN-underlay.png
|
20251105 - to Civil - CAD background
|
2025-11-05 20:18:56 -06:00 |
|
PHASE 2 - DEMOLITION PLAN-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
PHASE 2 - MEZZ-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - MEZZ-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - MEZZ-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - MEZZ-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - ROOF PLAN-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - ROOF PLAN-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - ROOF PLAN-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
PHASE 2 - ROOF PLAN-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
RCP - 1ST FLOOR-annotation.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - 1ST FLOOR-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - 1ST FLOOR-underlay.png
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - 1ST FLOOR-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
RCP - FRAMING - 1ST FLOOR_background-annotation.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
RCP - FRAMING - 1ST FLOOR_background-linework.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
RCP - FRAMING - 1ST FLOOR_background-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
RCP - FRAMING - 1ST FLOOR_background-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
RCP - FRAMING - 2ND FLOOR-annotation.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - FRAMING - 2ND FLOOR-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - FRAMING - 2ND FLOOR-underlay.png
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - FRAMING - 2ND FLOOR-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
RCP - FRAMING - 2ND FLOOR_background-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
RCP - FRAMING - 2ND FLOOR_background-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - FRAMING - ROOF-annotation.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - FRAMING - ROOF-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - FRAMING - ROOF-underlay.png
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - FRAMING - ROOF-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
RCP - FRAMING - ROOF_background-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
RCP - FRAMING - ROOF_background-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - MEZZ. FLOOR-annotation.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - MEZZ. FLOOR-linework.svg
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - MEZZ. FLOOR-underlay.png
|
20251216 - progress set
|
2025-12-16 18:57:58 -06:00 |
|
RCP - MEZZ. FLOOR-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - EW - NORTH-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - EW - NORTH-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - EW - NORTH-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - EW - NORTH-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - EW - SOUTH-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - EW - SOUTH-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - EW - SOUTH-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - EW - SOUTH-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - EAST - AT DROPOFF BAY-annotation.svg
|
snapshot
|
2025-10-15 21:27:36 -05:00 |
|
SECTION - NS - EAST - AT DROPOFF BAY-linework.svg
|
snapshot
|
2025-10-15 21:27:36 -05:00 |
|
SECTION - NS - EAST - AT DROPOFF BAY-underlay.png
|
snapshot
|
2025-10-15 21:27:36 -05:00 |
|
SECTION - NS - EAST - AT DROPOFF BAY-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SECTION - NS - EAST - AT SERVICE BAY-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - EAST - AT SERVICE BAY-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - EAST - AT SERVICE BAY-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - EAST - AT SERVICE BAY-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT DROPOFF BAY-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT DROPOFF BAY-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT DROPOFF BAY-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT DROPOFF BAY-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT EX. LOBBY-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT EX. LOBBY-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT EX. LOBBY-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT EX. LOBBY-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT LOBBY AND STAIRS-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT LOBBY AND STAIRS-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT LOBBY AND STAIRS-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT LOBBY AND STAIRS-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS - WEST - AT LOBBY-annotation.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SECTION - NS - WEST - AT LOBBY-linework.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SECTION - NS - WEST - AT LOBBY-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SECTION - NS - WEST - AT LOBBY-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SECTION - NS - WEST AT LOBBY-annotation.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SECTION - NS - WEST AT LOBBY-linework.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SECTION - NS - WEST AT LOBBY-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SECTION - NS - WEST AT LOBBY-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SECTION - NS -EAST - AT LOBBY-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS -EAST - AT LOBBY-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS -EAST - AT LOBBY-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS -EAST - AT LOBBY-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SECTION - NS -EAST - AT LOBBY-X-annotation.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
SECTION - NS -EAST - AT LOBBY-X-linework.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
SECTION - NS -EAST - AT LOBBY-X-underlay.png
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
SECTION - NS -EAST - AT LOBBY-X-underlay.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
SITE PLAN - PHOTOMETRIC PLAN-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SITE PLAN - PHOTOMETRIC PLAN-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SITE PLAN - PHOTOMETRIC PLAN-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SITE PLAN - PHOTOMETRIC PLAN-underlay.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SITE PLAN-annotation.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SITE PLAN-linework.svg
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SITE PLAN-linework0050.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SITE PLAN-underlay.png
|
20251203 - to City - pre Site Review
|
2025-12-03 12:40:03 -06:00 |
|
SITE PLAN-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
SITE PLAN_cad_background-annotation.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
SITE PLAN_cad_background-linework.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
SITE PLAN_cad_background-underlay.png
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
SITE PLAN_cad_background-underlay.svg
|
20251022 - to GC - pricing progress set
|
2025-10-22 13:33:01 -05:00 |
|
test-annotation.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
test-linework.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
test-underlay.png
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |
|
test-underlay.svg
|
20251013 - to owner - review before city review
|
2025-10-13 22:48:06 -05:00 |